| FazBrowse GitHub Viewer | Trending | | Home |
| Tools: [Download Repo ZIP] [Original HTTPS Page] |
When multiple target labels are applied to a PR, it should be considered invalid as our tooling does not support a single PR targetting multiple trains/versions.
There was a problem hiding this comment.
our tooling does not support a single PR targetting multiple trains/versions
I think this part of the commit sounds a little confusing. We do support merging into multiple trains/versions. For example, the target: patch label could result in merging into master, RC and patch. The commit message could be a little more clear on what the tooling does not support (multiple target labels?).
Otherwise lgtm 👍
Sorry, something went wrong.
There was a problem hiding this comment.
LGTM. One minor nit.
Sorry, something went wrong.
There was a problem hiding this comment.
LGTM (as soon as CI is happy) 🚀
Sorry, something went wrong.
When multiple target labels are applied to a PR, it should be considered invalid as our tooling does not support a single PR targetting multiple trains/versions. PR Close #40156
|
This issue has been automatically locked due to inactivity. Read more about our automatic conversation locking policy. This action has been performed automatically by a bot. |
Sorry, something went wrong.
| Back | FazBrowse Home | New Git URL |
When multiple target labels are applied to a PR, it should be considered
invalid as our tooling does not support a single PR targetting multiple
trains/versions.